Reboot24: Difference between revisions
m (→Photos: added images to gallery -- uploaded others, will add to gallery on future edit) |
m (→Photos: add to gallery -- add descriptions with links to guide people in exploring more of the wiki, as might arouse curiosity) |
||
| Line 17: | Line 17: | ||
[[Category:Todo]] | [[Category:Todo]] | ||
<gallery mode="nolines" widths=" | <gallery mode="nolines" widths="250" heights="180"> | ||
File:PXL 20240403 160309432.MP.webp|Bike rack installed | File:PXL 20240403 160309432.MP.webp|Bike rack installed, on the fence by the front [[gate]] | ||
File:Yellow lane -- hackitorium to front.webp|Yellow paint road, | File:Yellow lane -- hackitorium to front.webp|Yellow paint road, [[Hackitorium]] to front -- [[Accessibility]] and fire [[Safety]] | ||
File:Yellow lane -- hackitorium to back.webp|Yellow paint road, | File:Yellow lane -- hackitorium to back.webp|Yellow paint road, Hackitorium to back -- [[Accessibility]] and fire [[Safety]], past [[Flaschen Taschen]], [[Lockers]], CNC/[[Fabrication]], and the [[Wood Shop]] | ||
File:Upstairs project shelf, empty reboot24.webp|[[Upstairs]] project shelf, empty | |||
File:Books going, Reboot24.webp|Books leaving the [[library]] | |||
</gallery> | </gallery> | ||
==Plan== | ==Plan== | ||
Revision as of 23:02, 8 May 2024
| Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Stuff | Events | Projects | Meetings | Donate | E |
| About | Vision | 272 Capp | Materials | Testimonials | Lore | Photos | Hackerspaces | 501c3 | Press | Press Kit | Zine | Help | E |
| Lore | Oral histories | History | Anarchy | 83c | 2169 | 272 Capp | Anniversaries | Rebase | Reboot | Humanitarian | Kitchen | Drama | V · T · E |
Noisebridge Reboots are a temporary closure of the space to support cleanup/infra upgrades would otherwise be unlikely to be done.
There is currently a the 2024 Reboot planned from March 30th - April 6th.
The space will be closed aside from cleanup and select ongoing meetups/classes.
Check out the discord channel, #reboot24, for details and ongoing discussions.
Achieved
We repainted the floors including fire exit paths, cleared library, cleaned and restructured the electronics room and library. We kept, and are keeping, a running task board, post-it notes, downstairs near the rollup garage door.
Photos
Bike rack installed, on the fence by the front gate
Yellow paint road, Hackitorium to front -- Accessibility and fire Safety
Yellow paint road, Hackitorium to back -- Accessibility and fire Safety, past Flaschen Taschen, Lockers, CNC/Fabrication, and the Wood Shop
Upstairs project shelf, empty
Books leaving the library