Layout

From Noisebridge
Revision as of 07:53, 24 December 2021 by Lxpk (talk | contribs)
Jump to navigation Jump to search
Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Stuff | Events | Projects | Meetings | Donate E
272 Capp St. | Layout | Exits | Bathrooms | Network | Audio | AV | Construction | Electrical | Storage

STREET | Patio | Parking | Fence | Access | Gate | Payphone | Doorbell | Back patio | Roof | Neighbors
DOWNSTAIRS | Entrance | Stairs | Roll up door | Front | Print Shop | Arcade | Cafe |
Hackitorium | Stage | Electronics Bench | Wood Shop | Back hall | Metal Shop | Back Stairs |
UPSTAIRS | Lounge | Music | Electronics | Classrooms | Lockers | Privacy Booth | Fire escape | Plants | Sustenance | Housekeeping

E

The layout is always in flux but especially right now as we just moved into 272 and we are still figuring out where major items like the laser cutter and future elevator go to do electrical and construction work. Feel free to propose layout changes by modifying the floor plan or one of the existing layout images.

272 Layout

Dec 23 2021

2169 Layout

83c Layout